5. Development Miners Galleon Gold -West Cache Project

Dumas Contracting Ltd. · timmins, on, Canada

Location
timmins
Job Type
Full-time
Posted
June 11, 2026

Job Description

Dumas Mining – Development Miner

Position: Development Miner

Project: Galleon Gold – West Cache Gold Project

Rotation: 14/14

Shift: 12 Hour shifts

Wage: $67.00 – $81.50/HR

Potential Compensation: KPI / Retention Bonus – Referral Bonus

Travel/Accommodations/Meals: Per Site Specific Allowance

About the Role

As a Development Miner with Dumas, you will perform underground development activities such as drilling, blasting, scaling, and installing ground support. You’ll operate and maintain equipment like jumbos, bolters, and scoops, ensuring compliance with safety protocols, and conduct routine checks and maintenance.

Key Responsibilities

  • Perform underground development activities including drilling, blasting, scaling, and installing ground support.
  • Operate and maintain mining equipment such as jumbos, bolters, and scoops.
  • Ensure compliance with Dumas and site safety...

Ready to Apply?

Submit your application for 5. Development Miners Galleon Gold -West Cache Project at Dumas Contracting Ltd.

Apply Now