Location
Chakan
Job Type
Full-time
Posted
June 14, 2026
Job Description
Company:
Mahindra & Mahindra Ltd Responsibilities & Key Deliverables Preparation of BIW target sign off ( 1D PIST, 3D PIST, Nova B / Nova C). Providing Manufacturing feasibility report for each data release.Studying past projects Quality & Preparation of BIW Quality target for sign off.
Providing Manufacturing feasibility report for each data release to ensure manufacturability & product quality & consistency.
Defining Datums for all BIW panels / Sub assembly as well as design gap requirement.
Working knowledge of stack ups calculation for critical items (Seats fitment, Cradle, IP, etc.), CPQ (styling) feedback on product design.
Preparation of PFMEA/Control Plan document. Preparing of each MPDS Gateway audit.
DTS document of Gap and flush for Vehicle level (Nominal) to Styling and PD.
Arriving out special tolerances and GD&T for all points
Checking fixture methodology of Body (All incoming) & Vehicle critical parts.
Clamping plan prepar...