Define, plan, and execute comprehensive testing strategies for traction power substations (RS) connected to OCS, auxiliary substations (LPS, HVR/LVR), and siding station.
Ensure strict adherence to electrical safety protocols (e.g., LOTO procedures) to protect personnel during live equipment testing.
Witness Factory Acceptance Tests (FAT) and Site Acceptance Tests (SAT), verifying results and documenting anomalies in reports.
Troubleshoot issues during system integration, specifically with signaling, rolling stock, and SCADA.
Manage technical documentation, as-builts, and O&M manuals for final handover to the client.